WISPiab work meeting 200806

From WirelessAfrica
Jump to navigation Jump to search


Work meeting of the WISP-in-a-box project

The WISP-in-a-box project

Date

June 2-3-4, 2008

9-17 h

Location

Meraka Institute, Building 43 C, Hummingbird Room (C128, ground floor)


Pretoria

Invitation List

People and organisations with an active interest in building a concrete product that helps bringing

connectivity to underserviced, underprivileged and overcharged communities in Africa.


Invitation list:

  • Steve Song / Shuttleworth Foundation (monday only)
  • Rael Lissoos / Dabba
  • Henry Marnitz / Ndlovu Medical Centre (wednesday only)
  • Mark Summer, Inveneo (with request to forward to Ubiquiti)
  • Elektra
  • Mike Jensen (not confirmed)
  • Kobus Roux, Meraka (NOT monday)
  • Karel Matthee, Meraka
  • Kim Gush, Meraka
  • David Johnson, Meraka
  • Chris Morris, Meraka
  • Grant Cambridge, Meraka
  • Shela Boshomane, Meraka (monday and wednesday)
  • George James, Meraka
  • Johann Hugo, Meraka
  • John Hay, Meraka
  • Ajay Makan, Meraka
  • Sebastian Buettrich



More proposals are welcome!

Budgets for travel, if needed: Please contact us!

Contact

Sebastian

mail: sebastian@less.dk

skype: sebastian_buettrich

cell: (+27) (0) 79 915 32 92

Timeplan

The timeplan is draft level and will be adjusted to people's ability to join for limited periods.

The first day will be dedicated to the organizational layer,

introducing the various projects and teams, discussing the business models, identifying overlap of work agendas as well as the main challenges each of the projects are seeing.

The second day will move down to detail level, moving from business and organizational models to technology requirements/specifications.

The third day



Day 1 - Monday, June 2

Morning

Creating Context

Introductions, Presentations of participants

(Short 10 mns, informal project introductions)

  • Introduction and WISPiab Project (Sebastian Buettrich)
  • Dabba / Orange Farm / Village Telco (Rael Lissoos)
  • Ndlovu Medical Centre (Henry Marnitz) (moved to Wednesday, June 4)
  • Peeble's Valley Mesh (David Johnson)
  • Digital Doorway (tba)
  • Inveneo platform (Mark Summer)
  • WISPiab work status (George James)
  • Wireless Africa project (Chris Morris)
  • Freifunk, B.a.t.m.a.n. & Meraka Mesh Testbed (Elektra)
  • DIY Guide & Zambia LinkNet (Karel Matthee)
  • IP04 (it46, rowetel) (on behalf of the project: Sebastian Buettrich)

Afternoon

Business models

Introduction: Sebastian

Business models may be classified according to a number of different dimensions -

e.g. financial/economic layer, tech/network topology layer, applications layer, social layer, -

Based on the experience of the participants and projects, business models should be reviewed with the goal of reaching a downselection of models that should be implemented/supported in the first iteration of the WISPiab project.

Classical examples:

  • Voice services - The Village Telco
  • "Line sharing" - sharing internet access between organizations
  • Telecentre / Internet Cafe
  • Campus / School network

The goal is to go through all our relevant models, to classify them on all layers,

and to identify the technology implications (such that technology follows business models, and not vice versa), producing a clear results list.


Cooperations and Resources

There is significant overlap between projects on the technology layer. All projects are subscribing to free software models (GPL / CC, etc).

We are operating against a backdrop of

  • challenged (human) resource situation
  • brain drain / skills exodus
  • wanting to build local (i.e. african? ... southern african? .... south african?) capacity

Cooperation between projects seems appropriate and possible.

The goal is to conclude this meeting with a clear picture of modes of cooperation.


Advisory Group

We wish to form an advisory group / peer group, including partly the invitees of this meeting, but not limited to these.


Day 2 - Tuesday, June 3

Morning

Technical Requirements / Specifications - detail level

Examples of concrete detail issues:

  • Authentication - where and how
  • Billing in mesh networks
  • VoIP in mesh networks


The goal of this session is to fill the matrix of

technology requirements x project/business model

and then check this matrix against the various existing hardware/software platforms.


Hardware platforms aspects

A number of different hardware/software platforms are fulfilling subsets of our requirements.

The available platforms need to be discussed and evaluated, towards a decision on what to choose.

The platforms that our projects are currently working with are:

  • Linksys WRT54, with firmwares OpenWRT, DD-WRT, Freifunk, CoovaAP, and similar
  • Open-Mesh, Accton - with Open Mesh Firmware (new firmware anoounced for summer 2008, with: RO.B.IN, orangemesh, COOVA, etc)
  • Inveneo platform
  • Ubiquti NS, PS
  • Meraka Bokkie routers
  • pls add!


Hands-on work

Part of this session will be practical experiments with the platforms - if appropriate, in breakout sessions.


Afternoon

Productification / Dissemination / Rollout strategies

  • Strategies for the productification of software packages
    • Sourceforge platform plans (Steve?)
    • Ubuntu / UCK (Sebastian, Mark, Elektra)
  • Rollout capacity

Hands-on work

Part of this session will be practical experiments with the platforms - if appropriate, in breakout sessions.


Day 3 - Wednesday, June 4

Morning

Ndlovu Medical Center

Status and Agenda of network at Ndlovu Medical Center

  • How can the various projects benefit Ndlovu Medical Center?


Status, gaps and planning of implementations

  • WISPiab status and work plan
  • Dabba / Village Telco work sprint, June 16-20
    • prepare and support that workshop

Hands-on work

Part of this session will be practical experiments with the platforms - if appropriate, in breakout sessions.

Afternoon

Conclusions & Next steps

  • Dabba Worksprint
  • WISPiab work plan
  • Digital Doorway work
  • Wireless Africa, June meeting

etc

Notes from the meeting - Day 1

People & Project introductions

  • Introduction and WISPiab Project (Sebastian Buettrich)
  • Peeble's Valley Mesh (David Johnson)
  • Dabba / Orange Farm / Village Telco (Rael Lissoos)
  • Inveneo platform (Mark Summer)
  • Freifunk (Elektra)
  • DIY Guide & Zambia LinkNet (Karel Matthee)
  • WISPiab work status (George James)
  • Two radio mesh router (Johann Hugo)
  • Wireless Africa project (Chris Morris)

Forming an Alliance?

to be edited

Notes from the meeting - Day 2

Day2 (L-R) Mark Summer, Johann Hugo, Mike Jensen, Electra, Sebastian Beutrich, Kobus Roux, Geroge James, Ajay Makan, Karel Matthee


Requirements, Specifications, Wishlist

Whiteboard Day 2
What? Which element Existing Who/how Alternate names/terms Task
Network Settings core FF, IHL, Coova (wifidog) + alternatives, Linksys & Netgear interfaces Network Management, Setup,
ISP settings core Coova, phpMyPrepaid, OpenWRT (QoS script) (...)shaper user/service profiles – provisioning (some of it -> QoS)
VoIP Settings Users, tarriffs voice AsteriskNow IP04 HW, Trixbox, A2billing, (Open)SER -->user profiles, --> VoIP settings
Prepaid Card System (print cards) (ops), ->web, ->voice web, voice phpMyPrepaid, A2billing “usage”
CRM core compiere

Notes from the meeting - Day 3